Project ranges

Transparent starting ranges for scan-to-CAD work.

Pricing depends on part size, surface finish, access, detail level, CAD complexity, inspection requirements, travel, and turnaround. These Los Angeles-area ranges are planning numbers, not fixed quotes.

Quote logic

Quotes depend on the part, the output, and the risk.

Geometry, finish, CAD detail, proof requirements, travel, and turnaround all affect the final number.

GeometryFinishCADDeadline
Pricing guide

Planning ranges before a real quote.

These are Los Angeles-area starting ranges to help visitors understand scale. Final pricing should always be based on part review, geometry, deliverables, and deadline.

How quotes are judged

Price follows risk, not a menu label.

A scan-only job, a clean scan-to-CAD rebuild, and a deviation-backed project can all start from the same physical part. The quote changes when the work becomes harder to capture, interpret, verify, or package for manufacturing.

01Geometry complexity 02Surface finish 03CAD detail level 04Deviation proof 05Part size/access 06Deadline / on-site
SendPhotos, rough size, material, and goal ReviewKymerion confirms scope and deliverables QuoteYou get a practical range before work starts

Pricing is shown as a public planning guide only. Small clean parts cost less; large assemblies, reflective/dark surfaces, tight deadlines, high-detail CAD, deviation reporting, or on-site work cost more.

Next step

Need a real number?

Pricing ranges are only planning numbers. A useful quote needs the part geometry, output type, deadline, and any reference files.